Concrete Curing Time Calculator — Accurate Curing Time Estimates

Concrete Curing Time Calculator

Calculate concrete curing times based on mix type, environmental conditions, and project requirements. Get accurate estimates for optimal concrete strength development and project scheduling.

Step 1: Concrete Specifications

70%

Standard Concrete Curing Times

Standard Portland cement: 7 days for 70% strength, 28 days for full strength. Rapid hardening: 3 days for 70% strength. Temperature significantly affects curing time.

Step 2: Environmental Conditions

1 Type

Optimal Curing Conditions

Ideal temperature: 20-25°C. Maintain humidity above 80% for optimal curing. Avoid temperature extremes and rapid moisture loss for best strength development.

Concrete Curing Time Results

Summary
Strength Development
Concrete Comparison

Estimated Curing Time to Reach Target Strength

7 days
High Strength Mix at 20°C
Time to 50% Strength
3 days
Time to 70% Strength
7 days
Time to Full Strength
28 days
Temperature Factor
Normal

Concrete Strength Development Over Time

Initial Setting Time
2-4 hours
Final Setting Time
6-10 hours
Formwork Removal
2-3 days
Load Application
7+ days

Concrete Type Comparison

Concrete Type Time to 70% Strength Full Strength Time Recommended Uses