Concrete Curing Time Calculator
Calculate concrete curing times based on mix type, environmental conditions, and project requirements. Get accurate estimates for optimal concrete strength development and project scheduling.
Step 1: Concrete Specifications
70%
Standard Concrete Curing Times
Standard Portland cement: 7 days for 70% strength, 28 days for full strength. Rapid hardening: 3 days for 70% strength. Temperature significantly affects curing time.
Step 2: Environmental Conditions
1 Type
Optimal Curing Conditions
Ideal temperature: 20-25°C. Maintain humidity above 80% for optimal curing. Avoid temperature extremes and rapid moisture loss for best strength development.
Concrete Curing Time Results
Summary
Strength Development
Concrete Comparison
Estimated Curing Time to Reach Target Strength
7 days
High Strength Mix at 20°C
Time to 50% Strength
3 days
Time to 70% Strength
7 days
Time to Full Strength
28 days
Temperature Factor
Normal
Concrete Strength Development Over Time
Initial Setting Time
2-4 hours
Final Setting Time
6-10 hours
Formwork Removal
2-3 days
Load Application
7+ days
Concrete Type Comparison
| Concrete Type | Time to 70% Strength | Full Strength Time | Recommended Uses |
|---|