Concrete Block Fill Calculator — Calculate Concrete Needed for Blocks

Concrete Block Fill Calculator

Calculate how much concrete you need to fill concrete blocks. Estimate materials and costs for block wall projects.

Step 1: Block Details

blocks
100%

Understanding Block Fill

Standard concrete blocks typically have two or three cores that need filling. The fill percentage accounts for the empty space within each block that requires concrete.

Step 2: Concrete Details

10%

About Concrete Calculation

Concrete is typically measured in cubic yards or cubic meters. One cubic yard covers approximately 40 square feet at 8 inches thick. Always add a waste factor for spillage and over-excavation.

Concrete Block Fill Results

Summary
Block Comparison
Volume Breakdown

Total Concrete Required

1.85 yd³
Total Cost: $277.50
Total Volume
1.85 yd³
Concrete Bags Needed
84 bags
Cost Per Block
$2.78
Material Efficiency
Good

Block Type Comparison

Block Type Dimensions (inches) Concrete per Block Total Concrete Total Cost

Volume Breakdown Analysis

Concrete Calculation Formula

Volume = (Blocks × Block Volume × Fill %) × (1 + Waste %)

The total concrete volume is calculated by multiplying the number of blocks by the volume of each block, adjusting for fill percentage, then adding extra for waste. Convert to cubic yards by dividing by 46656 (36×36×36 inches).

Need Professional Concrete Estimation?

Connect with our construction experts for detailed concrete calculations, material estimates, and project planning assistance.

Get Professional Estimation