Cubic Yards Concrete Calculator

Calculate the cubic yards of concrete needed for your project. Determine concrete volume for slabs, footings, walls, columns, and other concrete structures.

Step 1: Project Dimensions

Feet
Feet
Feet (4 inches = 0.33 ft)

Common Thickness Reference

4 inches = 0.33 ft • 5 inches = 0.42 ft • 6 inches = 0.5 ft • 8 inches = 0.67 ft • 10 inches = 0.83 ft • 12 inches = 1 ft

Step 2: Options & Quantity

10%

About Waste Factor

A 10% waste factor is recommended for most projects to account for spillage, over-excavation, and variations in subgrade. For complex projects, consider 15-20%.

Concrete Volume Results

Summary
Project Comparison
Breakdown

Concrete Needed

2.47
Cubic Yards (including 10% waste)
Total Cubic Yards
2.47 yd³
80lb Bags Needed
112 bags
Net Volume (no waste)
2.24 yd³
Total Cubic Feet
66.7 ft³

Common Project Size Comparison

Project Type Dimensions Cubic Yards 80lb Bags

Volume Calculation Breakdown

Cubic Yards Formula

Cubic Yards = (Length × Width × Depth) ÷ 27

First calculate cubic feet: Length (ft) × Width (ft) × Depth (ft). Then divide by 27 to convert to cubic yards (1 cubic yard = 27 cubic feet). Add waste factor percentage.